Mains failure in generator operation (MFail_stop): The torque required for stopping is only built up with a delay (corrected from V01.03.07)
Corrected from:
Servo inverter i950: FW as of V01.03.07.1252
Response of the new version:
When stopping, the torque build-up in generator operation is now started with the appropriate starting value, so that the load is managed in the best possible way.
What happens?
In the event of a power failure during generator operation, the torque required for stopping is only built up after a delay. Accordingly, the load cannot be guided continuously. The reason for this is that when stopping the torque build-up is started at an inaccurately fitting value.
When does the behaviour occur? When using the function mains failure control (MFail_stop) and mains failure in generator operation.
Whic products are affected: Servo inverter i950: FW