The HotConnect group does not reach the Operational status (fixed as of V1.15)
Fixed from:
Controller c430 V1.15
Controller c520 V1.15 Controller c550 V1.15
Behavior of the new version;
The EtherCAT participants of all HotConnect groups go into Operational.
Description of behavior: After starting a PLC project, the participants in a HotConnect group do not reach the Operational status.
Conditions under which the behavior occurs;
A project with HotConnect groups is used. The HotConnect group contains an EtherCAT junction or a c430 as an ECAT slave and the flag Auto Operational is active.