Acceptance protocol for SM302 - MM replacement

Question:
Is there an acceptance protocol form available when the memory module and, if necessary, the SM302 must be replaced?
 

Answer:
A service acceptance protocol form can be found in the attachment. The form must be filled in by the service engineer. Additional documents are available for commissioning an SM302 and safety module replacement.


URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/201700408/1/
Contact form