PLC target system sends a boot-up event during download (elimination)

Which products are affected?
EPL-10200 (Drive PLC V8.1)
EVS93xx-EI (Servo PLC V8.0)
EVS93xx-ET (Servo PLC V8.0 with technology function)

Eliminated function restriction:
In response to a node guarding telegram the PLC target system does not send a boot-up event during the project download. However, the PLC target system cannot execute the typical change of the toggle bit state in the response while the project is downloaded.
 
 
Which products are affected?
EPL-10200 (Drive PLC V7.1 and lower)
EVS93xxEI (Servo PLC V7.2 and lower)
EVS93xxET (Servo PLC with technology function V7.2 and lower) 

What happens?
In response to a node guarding telegram the PLC target system sends a boot-up event during the project download.
Dependent on the set response to this answer it may happen that the CAN master sends a Reset-Node. Due to this Reset-Node the project download is aborted too early.

When does the problem occur?
The response described before occurs if the PLC target system is configured as Slave with node guarding (C0352 = 4) and a node guarding telegram has been received while a project has been downloaded, e. g. by means of the Global Drive Loader software.

Possible diagnostics?
None.

Short-term measures/recommendations?
Deactivate node guarding functionality in the CAN master before a project is downloaded to a PLC target system.

Evaluation:
The function restriction only occurs during the project download if the PLC target system has been configured as Slave with node guarding.

URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/200800525/1/