Acceptance protocol for SM301 - MM replacement

Question:
Is there an acceptance protocol form available when the memory module and, if necessary, the SM301 must be replaced?

 

Answer:
A service acceptance protocol form can be found in the attachment. The form must be filled in by the service engineer. Additional documents are available for commissioning an SM301 and safety module replacement.


URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/201011784/1/
Kontaktformular