i950 introduction (part 2): Wiring

Key picture of Tutorials i950 - Wiring v2.png


Content:

  1. ​Complete electrical installation in cabinet to start i950 
    1. 3 phase mains connection (X100)
    2. 24 V DC supply for control electronics (X5)
    3. Motor holding brake (X106)
    4. 24 V DC supply for motor holding brake (X107)
    5. Motor connection (X105) via OCT (One Cable Technology | X109)
    6. Basic safety function STO (X1)
    7. Ethernet connection for commissioning and diagnostics (X16)
    8. Encoder feedback (Option A and B)
Duration:

02:46 min​


Link list​:

Next video: How to set up rotary axis by EASY Starter?

Other interesting video: Handling project files: Create, save and open projects

Previous video: Unboxing


You will find more information about the Lenze training on the Lenze Website: Training Service


URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/202500110/1/

Further information

Contact form