More tolerant mains monitoring under poor mains conditions, LP1 message (from V5.0)

Function extension:
Under poor mains conditions, the mains monitoring is now able to react more tolerantly to mains voltage/mains frequency fluctuations so that the DC bus can be charged in one more tolerance zone now.
If the tolerances are exceeded and the charging function cannot be enabled several times in a row because the device is protected, an LP1 fault message is now issued every time to signal this process.
Previously, unfavourable situations were likely to occur: The power supply could not be enabled cyclically, hence the DC bus could not be charged, but this process was not signalled.

In which products/versions is it included?
ECS power supply module from V5.0

URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/200908136/1/