CAN initialisation after a bus off without mains switching (from V5.0)

Function extension:
Via the newly implemented 'bus off recovery sequence', the CAN controller can be reinitialised during operation after a 'bus off'.
Previously, mains switching had always been required for the initialisation after a bus off.

In which products/versions is it included?
ECS power supply module from V5.0

URL for linking this AKB article: https://www.lenze.com/en-de/go/akb/200907980/1/
Formulario de contacto