array(4 items)
   caller => 'TYPO3\CMS\Core\Database\DatabaseConnection::exec_SELECTquery' (60 chars)
   ERROR => 'You have an error in your SQL syntax; check the manual that corresponds to y
      our MySQL server version for the right syntax to use near 'LIMIT 1' at line
      1
' (153 chars) lastBuiltQuery => 'SELECT * FROM tx_imilenzetheme_domain_model_sociallinks WHERE pid = 10455 AN
      D deleted = 0 AND hidden = 0 AND sys_language_uid = LIMIT 1
' (136 chars) debug_backtrace => '{closure}#34 // TYPO3\CMS\Frontend\Http\Application->run#33 // TYPO3\CMS\Cor
      e\Core\Bootstrap->handleRequest#78 // TYPO3\CMS\Frontend\Http\RequestHandler
      ->handleRequest#308 // TYPO3\CMS\Frontend\Page\PageGenerator::renderContent#
      216 // TYPO3\CMS\Frontend\ContentObject\ContentObjectRenderer->cObjGet#210 /
      / TYPO3\CMS\Frontend\ContentObject\ContentObjectRenderer->cObjGetSingle#805
      // TYPO3\CMS\Frontend\ContentObject\ContentObjectRenderer->render#859 // TYP
      O3\CMS\Frontend\ContentObject\UserContentObject->render#943 // TYPO3\CMS\Fro
      ntend\ContentObject\ContentObjectRenderer->callUserFunction#40 // call_user_
      func_array#7322 // TYPO3\CMS\Extbase\Core\Bootstrap->run# // TYPO3\CMS\Extba
      se\Core\Bootstrap->handleRequest#193 // TYPO3\CMS\Extbase\Mvc\Web\FrontendRe
      questHandler->handleRequest#206 // TYPO3\CMS\Extbase\Mvc\Dispatcher->dispatc
      h#69 // TYPO3\CMS\Extbase\Mvc\Controller\ActionController->processRequest#86
       // TYPO3\CMS\Extbase\Mvc\Controller\ActionController->callActionMethod#176
      // call_user_func_array#283 // FluidTYPO3\Flux\Controller\AbstractFluxContro
      ller->renderAction# // FluidTYPO3\Flux\Controller\AbstractFluxController->pe
      rformSubRendering#206 // TYPO3\CMS\Fluid\View\AbstractTemplateView->render#2
      35 // FluidCache_ImiLenzeTheme_Page_layout_Page_FullWidth_1400e122473ea2d386
      a878a74abe2566d046449d->render#189 // TYPO3\CMS\Fluid\ViewHelpers\RenderView
      Helper::renderStatic#116 // TYPO3\CMS\Fluid\View\AbstractTemplateView->rende
      rPartial#119 // TYPO3\CMS\Fluid\View\AbstractTemplateView->renderSection#286
       // FluidCache_ImiLenzeTheme_Page_partial_Page_Footer_Footer_2c8803014ea6146
      cecc35afd7148bbcadef587e4->section_62bce9422ff2d14f69ab80a154510232fc8a9afd#
      230 // TYPO3\CMS\Fluid\ViewHelpers\RenderViewHelper::renderStatic#38 // TYPO
      3\CMS\Fluid\View\AbstractTemplateView->renderSection#121 // FluidCache_ImiLe
      nzeTheme_Page_partial_Page_Footer_Footer_2c8803014ea6146cecc35afd7148bbcadef
      587e4->section_26c01e70a337f208f56dae1c3bc18f60c4bff453#230 // TYPO3\CMS\Flu
      id\ViewHelpers\RenderVie...
' (2851 chars)
MCC - Lenze. As easy as that.

MCC – simply thinking ahead with mechatronics

We want to prepare our traditional business pillar, mechatronics, for the future and thereby optimally position ourselves to successfully compete internationally. The Mechatronic Competence Campus (MCC), which is currently being developed at our Extertal site in North Rhine-Westphalia, will play a key roll. With an investment of around EUR 50 million in the company's future as well as in the sustainability of the region, we are creating the ideal framework conditions for our 800 staff at the site to continue developing sophisticated mechatronic solutions and systems for our customers around the globe.

Mechatronic Competence Campus (MCC) at a glance.

Laying of the foundation stone

The foundation stone for the building project was laid on 28 September 2018. The ground-breaking ceremony took place in the presence of, among others, the Minister President of the state of North Rhine-Westphalia, Armin Laschet, who insisted on travelling to Extertal to hold an opening speech.

In front of around ninety guests from the fields of economics and science, as well as partner company representatives, the Minister President, together with Monika Rehmert, Mayor of the municipality of Extertal, Babette Herbert and Nikolaus Belling, both Lenze family shareholders, and the Chairman of our Executive Board, Christian Wendler, buried a time capsule in the masonry for the new Mechatronic Campus and – as is customary for the laying of the foundation stone – bricked it up with a trowel and mortar.

Track the construction progress of the MCC live!

With the help of a webcam, you can follow the construction progress of the Mechatronic Competence Camous live. On this website you can view snapshots as well as small time-lapse videos. We hope to give you some interesting insights.

Track the construction progress here!

Laying of the foundation stone: The time capsule is embedded into the masonry.

The Mechatronic Competence Campus (MCC) as a model.

Aftermovie Laying of the Foundation Stone MCC 2018